The first buyers of the Chevrolet Volt electric vehicle with extended-range capability will be eligible for one of 4,400 free home charging stations. The program will provide Volt owners with a 240-volt charge station from either ECOtality, Inc. or Coulomb Technologies. In many cases, it will include the cost of home installation. The projects are made possible with a grant of American Recovery and Reinvestment Act funds from the Transportation Electrification Initiative administered by the U.S. Department of Energy (DOE).
"Many owners will plug their Volt into a normal 120-volt electrical outlet, charge overnight and drive to work in the morning using only battery power," said Tony DiSalle, Product and Marketing Director for the Chevrolet Volt. "For Volt owners who want to install a faster 240-volt charge station, we expect the Department of Energy project to save $1,000 and $2,000."
The U.S. Department of Energy projects were established with two objectives: installing charging stations in residential, workplace and public areas to encourage consumers to purchase electric vehicles; and studying electric vehicle usage to optimize future electric vehicle charging infrastructure.
To encourage consumer purchases of electric vehicles, federal grants and other funds have been awarded to install more than 15,000 home charge stations. That total includes 4,400 home charge stations for Volt owners; 2,600 as part of The EV Project from ECOtality, and 1,800 as part of the ChargePoint America project from Coulomb Technologies.
To study electric vehicle usage, the programs will collect data such as average charge time, energy usage and the starting and ending time of the charging process. This data will be analyzed by the U.S. Department of Energy to understand how electric vehicles are driven, how and when they are charged, and ultimately what is required for widespread adoption of electric vehicles.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment